| value |
{"aggregator_url":"https://www.sec.gov {"aggregator_url":"https://www.sec.gov/Archives/edgar/data/64463/0001493152-26-018192.txt","as_of":"2026-04-22T03:03:32.063787+00:00","canonical_url":"https://www.sec.gov/Archives/edgar/data/64463/0001493152-26-018192.txt","company":"Soluna Holdings, Inc","enrichment":{"aggregator_url":"https://www.sec.gov/Archives/edgar/data/64463/0001493152-26-018192.txt","article_chars":5000,"article_truncated":true,"blocked_reason":null,"candidate_id":"sc_8b7571b928a31737","canonical_host":"sec.gov","canonical_is_aggregator":false,"canonical_url":"https://www.sec.gov/Archives/edgar/data/64463/0001493152-26-018192.txt","content_type":"text/plain","enriched_at":"2026-04-22T03:28:15.416829+00:00","extraction_method":"trafilatura","fetched_description":"","fetched_title":"","final_url":"https://www.sec.gov/Archives/edgar/data/64463/0001493152-26-018192.txt","html_truncated":true,"paywall_likely":false,"publisher_domain":"sec.gov","publisher_resolution":"canonical_url","requested_url":"https://www.sec.gov/Archives/edgar/data/64463/0001493152-26-018192.txt","source_event_id":"evt_79f32b76057a","source_quality":"high","status_code":200,"version":"signal_enrichment_v2"},"form_type":"8-K","fp":"ba2305d6ca96cfa3","kind":"sec_filing","published_at":"20260421","publisher_domain":"sec.gov","signal_understanding":{"analysis_basis":"article","claim_confidence":0.86,"dates_mentioned":["2026-04-21","2026-04-22","March 2026","February 2026"],"entities":[{"asset_class":"equity","name":"Soluna Holdings, Inc","relevance":"high","symbol":"SLNH","type":"issuer"},{"asset_class":"other","name":"Blockware","relevance":"high","symbol":"","type":"partner/customer"},{"asset_class":"other","name":"Project Dorothy 1B","relevance":"high","symbol":"","type":"data center site"},{"asset_class":"other","name":"Project Dorothy 1A","relevance":"medium","symbol":"","type":"data center site"},{"asset_class":"other","name":"Briscoe Wind Farm","relevance":"medium","symbol":"","type":"energy asset"},{"asset_class":"other","name":"NASDAQ","relevance":"low","symbol":"SLNH","type":"exchange"}],"event_type":"listing","information_gaps":["What changed vs prior known state is not explicitly provided in the signal beyond referencing a February expansion and stating this is the fourth expansion; no prior 8-K/previous state is included in the provided text to compare directly.","The 8-K header fields (e.g., exact registrant telephone number, former name/address) are not populated in the cleaned text.","No financial guidance, revenue impact, or quantified financial implications are provided in the excerpt; only operational/capacity updates are disclosed.","The specific terms of the Blockware agreement (pricing, contract duration, milestones) are not included in the provided text."],"key_facts":["The 8-K includes Item 7.01 Regulation FD Disclosure.","The press release was issued on April 21, 2026 and is attached as Exhibit 99.1.","The agreement adds 3.3 MW of capacity at Soluna\u2019s Project Dorothy 1B site in West Texas.","This is Blockware\u2019s fourth expansion with Soluna and its first deployment at Project Dorothy 1B.","With the latest addition, Blockware becomes the first customer signed at Dorothy 1B, described as a 25 MW data center co-located with and powered by the Briscoe Wind Farm.","Soluna states it recently acquired the Briscoe Wind Farm in a $53 million transaction to enable vertical integration between energy generation and data center operations.","Across all sites, Blockware\u2019s total deployed capacity with Soluna now exceeds 17 MW.","The press release states deployment for the most recent project began in March.","The press release references a prior February expansion adding 6 MW at Dorothy 1A.","The press release states Soluna has announced plans to develop Project Dorothy 3 at the same campus following its acquisition of the Briscoe Wind Farm.","The 8-K states the Item 7.01 and Exhibit 99.1 information will not be treated as \u201cfiled\u201d for Section 18 liabilities and will not be incorporated by reference into other filings unless expressly incorporated."],"numeric_claims":[{"label":"Added capacity at Project Dorothy 1B (MW)","value":"3.3 MW"},{"label":"Dorothy 1B total data center capacity (MW)","value":"25 MW"},{"label":"Blockware total deployed capacity with Soluna (MW)","value":"> 17 MW"},{"label":"Briscoe Wind Farm acquisition transaction value","value":"$53 million"},{"label":"Prior February expansion capacity at Dorothy 1A (MW)","value":"6 MW"}],"primary_claim":"On April 21, 2026, Soluna issued a press release (Exhibit 99.1) announcing a Blockware partnership expansion adding 3.3 MW at Project Dorothy 1B, Blockware\u2019s first deployment at that site, and increasing Blockware\u2019s total deployed capacity with Soluna to over 17 MW.","relevance_score":0.62,"sentiment":"positive","source_quality":"high","summary":"Soluna Holdings, Inc. filed a Form 8-K to disclose a Regulation FD press release dated April 21, 2026 about expanding its partnership with Blockware. The expansion adds 3.3 MW at Project Dorothy 1B in West Texas, bringing Blockware\u2019s total deployed capacity with Soluna to over 17 MW.","topics":["Form 8-K","Regulation FD","partnership expansion","data center capacity","Project Dorothy","renewable energy integration","Exhibit 99.1"]},"source":"sec_edgar","source_domain":"sec.gov","summary":"Form 8-K \u00b7 Soluna Holdings, Inc \u00b7 Filed 20260421","ticker":"SLNHP","tickers":["SLNHP"],"title":"SLNHP filed 8-K","url":"https://www.sec.gov/Archives/edgar/data/64463/0001493152-26-018192.txt"}... |