| value |
{"aggregator_url":"https://www.sec.gov {"aggregator_url":"https://www.sec.gov/Archives/edgar/data/1846715/0001213900-26-040711.txt","as_of":"2026-04-08T19:57:42.365437+00:00","canonical_url":"https://www.sec.gov/Archives/edgar/data/1846715/0001213900-26-040711.txt","company":"Eco Wave Power Global AB (publ)","enrichment":{"aggregator_url":"https://www.sec.gov/Archives/edgar/data/1846715/0001213900-26-040711.txt","article_chars":5000,"article_truncated":true,"blocked_reason":null,"candidate_id":"sc_f4d0b46250052740","canonical_host":"sec.gov","canonical_is_aggregator":false,"canonical_url":"https://www.sec.gov/Archives/edgar/data/1846715/0001213900-26-040711.txt","content_type":"text/plain","enriched_at":"2026-04-09T00:11:07.213584+00:00","extraction_method":"heuristic","fetched_description":"","fetched_title":"","final_url":"https://www.sec.gov/Archives/edgar/data/1846715/0001213900-26-040711.txt","html_truncated":false,"paywall_likely":false,"publisher_domain":"sec.gov","publisher_resolution":"canonical_url","requested_url":"https://www.sec.gov/Archives/edgar/data/1846715/0001213900-26-040711.txt","source_event_id":"evt_56dd14e4cea3","source_quality":"high","status_code":200,"version":"signal_enrichment_v2"},"form_type":"6-K","fp":"e4a54e08a737f60f","kind":"sec_filing","published_at":"20260407","publisher_domain":"sec.gov","signal_understanding":{"analysis_basis":"article","claim_confidence":0.78,"dates_mentioned":["2026-04-07","2026-04-08","April 2026","March 2026","since the beginning of 2025"],"entities":[{"asset_class":"equity","name":"Eco Wave Power Global AB (publ)","relevance":"high","symbol":"WAVE","type":"issuer"},{"asset_class":"asset/project","name":"EWP-EDF One","relevance":"high","symbol":"","type":"project"},{"asset_class":"geography","name":"Jaffa Port","relevance":"high","symbol":"","type":"location"},{"asset_class":"equity","name":"NVIDIA","relevance":"medium","symbol":"","type":"company"},{"asset_class":"person","name":"Jensen Huang","relevance":"medium","symbol":"","type":"person"}],"event_type":"earnings","information_gaps":["What changed vs prior known state is not provided in the signal; only the current Form 6-K and its attached press release content are available here.","No financial figures (revenue, earnings, guidance) are disclosed in the provided text; the filing appears to be production-results related.","The excerpt truncates the last sentence of the press release (\u201care anticipated to mater\u2026\u201d), so any further details about future commercial deployments are missing.","The specific SEC incorporation-by-reference language is provided, but the actual content of the incorporated paragraphs is not separately listed beyond the press release excerpt."],"key_facts":["The filing is a Form 6-K for a foreign private issuer for the month of April 2026.","On April 7, 2026, the Company issued a press release titled \u201cEco Wave Power Reports March 2026 Production Results at Jaffa Port, Highlighting Potential to Power Coastal AI Infrastructure.\u201d","The press release is furnished as Exhibit 99.1 with the Form 6-K.","The press release states that during March 2026 the system operated continuously.","The press release states that approximately six days in March had moderate wave conditions in the range of 1 to 2 meters.","The press release states that during those days the project generated more than 1,200 kWh of clean, renewable electricity.","The press release states that since the beginning of 2025, the EWP-EDF One system has maintained zero downtime and recorded stable operation in wave conditions of 1 meter and above.","The press release includes discussion of potential relevance to powering coastal infrastructure/data centers and references AI energy demand, including a blog ahead of NVIDIA\u2019s GTC and a keynote presentation by Jensen Huang.","The Form 6-K states that specified paragraphs and the \u201cForward-Looking Statements\u201d section of the press release are incorporated by reference into the Company\u2019s Registration Statements on Form F-3 (Registration Nos. 333-275728 and 333-282101)."],"numeric_claims":[{"label":"Moderate wave condition days (March 2026)","value":"approximately six days"},{"label":"Wave height range (moderate conditions)","value":"1 to 2 meters"},{"label":"Electricity generated during moderate-condition days (March 2026)","value":"more than 1,200 kWh"}],"primary_claim":"During March 2026, the EWP-EDF One system at Jaffa Port operated continuously and generated more than 1,200 kWh of electricity during days with moderate wave conditions (about six days with 1\u20132 meter waves).","relevance_score":0.62,"sentiment":"neutral","source_quality":"high","summary":"Eco Wave Power Global AB (publ) filed a Form 6-K on April 8, 2026 furnishing a press release (Exhibit 99.1) dated April 7, 2026 about March 2026 production results at its EWP-EDF One pilot project at Jaffa Port, Israel.","topics":["Form 6-K","production results","wave energy","Jaffa Port","EWP-EDF One pilot","renewable electricity generation","AI infrastructure energy demand","forward-looking statements","Exhibit 99.1"]},"source":"sec_edgar","source_domain":"sec.gov","summary":"Form 6-K \u00b7 Eco Wave Power Global AB (publ) \u00b7 Filed 20260407","ticker":"WAVE","tickers":["WAVE"],"title":"WAVE filed 6-K","url":"https://www.sec.gov/Archives/edgar/data/1846715/0001213900-26-040711.txt"}... |