Create
Query
event_store.db
—
events
actions
agent_runs
approvals
artifacts
commitments
constraints
conversation_compaction
conversation_state
conversation_turns
dead_letters
decisions
deliveries
effects
email_messages
email_reply_drafts
email_threads
entities
entity_aliases
entity_tags
episode_context_index
episodes
event_subjects
events
events_archive
fact_sources
facts
inbox_items
inbox_links
intel_memory
jobs
leader_leases
links
memory_candidates
memory_embeddings
memory_items
memory_items_fts
(v)
memory_items_fts_config
memory_items_fts_data
memory_items_fts_idx
opportunity_memory
pending_interactions
proposal_sources
proposals
reminders
schedules
schema_migrations
signal_candidates
signal_fps
signals
sms_conversations
sms_messages
sms_reply_drafts
source_cursors
sources
sqlite_sequence
sqlite_stat1
stream_cursors
threads
watchers
Toggle helper tables
memory_items_fts_content
memory_items_fts_docsize
memory_items_fts_segdir
memory_items_fts_segments
memory_items_fts_stat
Structure
Content
Query
Insert
Drop
Import
Export
Update row 93942 in events
seq
Primary key.
INTEGER
id
evt_2a9e11addf32
TEXT NOT NULL
kind
signal_ingest
TEXT NOT NULL
ts
2026-04-17T22:18:24.944996+00:00
TEXT NOT NULL
actor
daemon:signal_enrichment
TEXT
subject_entity_ids
[]
TEXT
payload
{"created_at":"2026-04-16T14:21:07.933747+00:00","dedupe_key":"signal_enriched:discovery_new_listings_delta:fc7fb3574ac18677","evidence_event_ids":["evt_aac608031638"],"signal_type":"discovery_new_listings_delta","source":"discovery_ingestor","value":{"aggregator_url":"https://www.nasdaq.com/articles/williams-starts-nese-project-expand-transco-pipeline-network","as_of":"2026-04-16T14:21:07.933747+00:00","canonical_url":"https://www.nasdaq.com/articles/williams-starts-nese-project-expand-transco-pipeline-network","enrichment":{"aggregator_url":"https://www.nasdaq.com/articles/williams-starts-nese-project-expand-transco-pipeline-network","article_chars":5000,"article_truncated":true,"blocked_reason":null,"candidate_id":"sc_9c8ad58b91418503","canonical_host":"nasdaq.com","canonical_is_aggregator":false,"canonical_url":"https://www.nasdaq.com/articles/williams-starts-nese-project-expand-transco-pipeline-network","content_type":"text/html; charset=utf-8","enriched_at":"2026-04-17T22:18:24.944934+00:00","extraction_method":"trafilatura","fetched_description":"WMB begins NESE pipeline expansion, boosting Transco capacity by 400,000 dekatherms/day to power 2.3M homes and strengthen Northeast energy supply.","fetched_title":"Williams Starts NESE Project to Expand Transco Pipeline Network | Nasdaq","final_url":"https://www.nasdaq.com/articles/williams-starts-nese-project-expand-transco-pipeline-network","html_truncated":false,"paywall_likely":false,"publisher_domain":"nasdaq.com","publisher_resolution":"canonical_url","requested_url":"https://www.nasdaq.com/articles/williams-starts-nese-project-expand-transco-pipeline-network","source_event_id":"evt_aac608031638","source_quality":"high","status_code":200,"version":"signal_enrichment_v2"},"fp":"e5542dc59bea7ced","kind":"new_listings","published_at":"2026-04-16T13:04:00+00:00","publisher_domain":"nasdaq.com","signal_understanding":{"analysis_basis":"article","claim_confidence":0.78,"dates_mentioned":["end of the fourth quarter of 2027"],"entities":[{"asset_class":"equity","name":"The Williams Companies, Inc.","relevance":"high","symbol":"WMB","type":"company"},{"asset_class":"infrastructure","name":"Transco pipeline system","relevance":"high","symbol":"","type":"infrastructure"},{"asset_class":"infrastructure","name":"Northeast Supply Enhancement (NESE) project","relevance":"high","symbol":"","type":"project"},{"asset_class":"location","name":"Floyd Bennett Field","relevance":"medium","symbol":"","type":"location"}],"event_type":"supply_disruption","information_gaps":["The signal type is labeled discovery_new_listings_delta, but the provided text describes a construction start for an infrastructure project; no listing-specific details are included.","No project cost, construction duration, or specific route/segment details are provided in the text.","The article does not specify whether the 400,000 dekatherms/day is incremental capacity, total capacity after expansion, or the timing of when the capacity becomes available.","The article claims permits are secured, but does not name the permitting authorities or permit dates.","No verification details are provided for the emissions reduction figure beyond the article\u2019s statement."],"key_facts":["Williams (WMB) officially began construction on the NESE project.","A groundbreaking ceremony was held at Floyd Bennett Field in Brooklyn.","The NESE project is aimed at expanding the capacity of the existing Transco pipeline system.","The expansion will increase Transco pipeline capacity by 400,000 dekatherms per day.","The article states this capacity is enough to power the equivalent of 2.3 million homes.","The article says the project will help supply New York, New Jersey, and Pennsylvania with reliable natural gas.","The article states federal and state construction permits are already secured.","The article states the project is on track to be fully operational by the end of the fourth quarter of 2027.","The article states the project is expected to reduce CO2 emissions by more than 13,000 tons.","The article states the project will use modern materials and electric motor-driven compressors to reduce emissions and noise compared with older infrastructure."],"numeric_claims":[{"label":"Capacity increase","value":"400,000 dekatherms/day"},{"label":"Homes equivalent","value":"2.3 million homes"},{"label":"Operational timing","value":"end of Q4 2027"},{"label":"CO2 emissions reduction","value":"more than 13,000 tons"}],"primary_claim":"The NESE project will expand Williams\u2019 Transco pipeline capacity by 400,000 dekatherms per day.","relevance_score":0.72,"sentiment":"positive","source_quality":"high","summary":"Williams (WMB) has begun construction on the Northeast Supply Enhancement (NESE) project to expand the Transco pipeline system. The expansion is described as adding 400,000 dekatherms/day of capacity, with an expected operational date by end of Q4 2027.","topics":["natural gas pipeline expansion","energy infrastructure","Northeast energy supply","capacity increase","construction start","operational timeline","emissions reduction"]},"source":"Nasdaq Stocks","source_domain":"nasdaq.com","summary":"WMB begins NESE pipeline expansion, boosting Transco capacity by 400,000 dekatherms/day to power 2.3M homes and strengthen Northeast energy supply.","tickers":[],"title":"Williams Starts NESE Project to Expand Transco Pipeline Network","url":"https://www.nasdaq.com/articles/williams-starts-nese-project-expand-transco-pipeline-network"}}
TEXT NOT NULL
source_ref
candidate:sc_9c8ad58b91418503
TEXT
confidence
REAL (default 0.0
dedupe_key
signal_enriched:discovery_new_listings_delta:fc7fb3574ac18677
TEXT
episode_id
NULL
TEXT
created_at
2026-04-17T22:18:24.945053+00:00
TEXT NOT NULL (default strftime('%Y-%m-%dT%H:%M:%fZ','now')
Update
Cancel